Precision kiln loading
Dec. 11th, 2024 10:35 amTwo weeks since my last firing. Everything is already in the kiln room, including my personal kiln shelves--I have nineteen--that I didn't bother putting away after last time. No clue how much work I have, though a back-of-the-envelope calculation says I definitely need a six-shelf stack.
I go through the usual three stages of loading: 1. Oh no, there's not enough stuff! 2. Oh no, there's too much stuff! and 3. Huh. That's not too bad.
As it happens, there was just enough stuff. I could have fit, maybe, another mug and a few cat food dishes, if I'd had them. And had four pots left over, a pie plate and three small/medium serving bowls.



I go through the usual three stages of loading: 1. Oh no, there's not enough stuff! 2. Oh no, there's too much stuff! and 3. Huh. That's not too bad.
As it happens, there was just enough stuff. I could have fit, maybe, another mug and a few cat food dishes, if I'd had them. And had four pots left over, a pie plate and three small/medium serving bowls.


