offcntr: (Default)
[personal profile] offcntr
Two weeks since my last firing. Everything is already in the kiln room, including my personal kiln shelves--I have nineteen--that I didn't bother putting away after last time. No clue how much work I have, though a back-of-the-envelope calculation says I definitely need a six-shelf stack.

I go through the usual three stages of loading: 1. Oh no, there's not enough stuff! 2. Oh no, there's too much stuff! and 3. Huh. That's not too bad.

As it happens, there was just enough stuff. I could have fit, maybe, another mug and a few cat food dishes, if I'd had them. And had four pots left over, a pie plate and three small/medium serving bowls.

This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

December 2025

S M T W T F S
 123 456
7 8910 1112 13
14151617 18 1920
21 2223 24252627
28293031   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Dec. 26th, 2025 11:05 pm
Powered by Dreamwidth Studios