Mar. 16th, 2020

offcntr: (live 1)
Back to the studio Saturday to begin a glazing run. I plan on loading the kiln Sunday, the 22nd, to fire in time for the (increasingly unlikely) opening of Saturday Market. I got a late start, as I had to unload and reload a bisque kiln at home first. Set up the back room for glazing, mixed up all my buckets, then decided to octopi the rest of the day with something other than the usual dipping and painting.



Best Friends, everybody!

December 2025

S M T W T F S
 123 456
7 8910 1112 13
14151617 18 1920
21 2223 24252627
28293031   

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Dec. 27th, 2025 06:45 am
Powered by Dreamwidth Studios