Progress

Nov. 3rd, 2016 09:57 pm
offcntr: (berto)
[personal profile] offcntr
I really should have known better than to take two weeks off between Clay Fest and Clayfolk, but I had a kiln-load already made and fired before we left, so I figured two more loads in two weeks would be manageable. (It usually takes about three bisque kiln loads to fill the 50 cubic foot glaze kiln.)

I didn't take into account autumn. Most of the first week was raining, the second, partly cloudy with anemic fall sunshine. The worst possible weather for drying pots. With the help of a space heater and ceiling fan, I managed, and by the time I was finishing these last four dozen soup bowls, the weather had improved enough to help out.


This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

December 2025

S M T W T F S
 123 456
7 8910 1112 13
14151617 18 1920
21 2223 24252627
28293031   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Dec. 26th, 2025 10:55 pm
Powered by Dreamwidth Studios