Last Monday I started another production cycle, with only five boxes of clay. At 50 lbs. per box, that's only 250 lbs. On a good week, I can go through that in about three days; even taking it easy, I'd be out before Saturday. So I called my supplier, Clay Art Center, and told them it was time for another ton of clay. "No problem," they said, "It'll be two weeks."

Two weeks?

Yes, all their freight orders were backed up, due to schools restocking for the new semester. They'd also had a clay mixer break down, and only just got it fixed.

Which left me in a fix. I'm scheduled to load a kiln at the end of the month. I need a week for glazing and decorating, which leaves just about two weeks to actually make the pots. With no clay.

Well, not much. The first thing I did was take a long look at my throwing list, prioritizing, what's essential (more special orders), what would be nice (extra soups, stews, plates), what can wait until April (teapots and oval platters, mostly). March is outside of the production cycle, being devoted to taxes and organizing the van for the start of Saturday Market.

Next, I checked on the drying bat of recycled clay I'd loaded up just after Thanksgiving, and discovered it wasn't. Drying, that is. It was still the consistency of, oh, Greek yogurt, only a slight improvement on the applesauce-like slop I'd started with. I cut it up into blocks, set them up on drywall boards next to the space heater, then started with the actual throwing list.

As of Wednesday, I was down to two boxes of clay, and the blocks were still softer than tofu. Think I'd better cut 'em into smaller chunks and turn up the heat.

February 2019

S M T W T F S
      12
345 67 89
1011121314 15 16
17181920212223
2425262728  

Links

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Feb. 18th, 2019 08:40 pm
Powered by Dreamwidth Studios